Follow these instructions for printing a Weekly Schedule or Monthly Schedule Report under the Child Care module. When printing the report, any Contracts for children scheduled to attend during the selected week will appear with an X designating their scheduled date(s) on the report. It can be run for one site/site section at a time or multiple at the same time.
- Point to Child Care.
- Select Sites or Site Sections.
- Search for and select a Site or Site Section to print the schedule for.
- Select Reports.
- Select Child Care Weekly Schedule Report or Care Monthly Schedule Report.
- Select Run Selected Reports.
- Update any of the Data fields (i.e. Start Date, Sort By - there are 3 choices: Name, Attending School or Grade, etc).
- Select Continue.
- When the Download button changes to green, select it to view the report.
Below is a sample Weekly Schedule Report.